CSR Implementation, Verification and Impact Assessment: What Is the Difference?
About Anaxee40,000+ Digital Runners · 540 districts · 26 states · 11,000+ pincodes of reach
2. Implementation: getting the work done on the ground
3. Verification: checking the work was done
4. Impact assessment: measuring what changed
A company approves a ₹5 crore programme. Twelve months later the CSR committee asks three questions. Was the work done? Was it done the way the report says? Did it change anything for the people it was meant for?
Those are three different questions, and each has its own name: implementation, verification and impact assessment. The words get used as if they mean the same thing, and that is where proposals, budgets and vendor choices go wrong. This page separates them.
The three jobs at a glance
Implementation
Reaching the households, running the sessions, installing the systems, distributing the kits, enrolling the people.
Question: is the work getting done, everywhere, on time?
Anaxee: yes. This is our main work.
Verification
A visit to confirm what was reported: the asset is installed where the report says, the beneficiary exists and received the benefit.
Question: was it executed as claimed?
Anaxee: yes, when a funder asks for it.
Impact assessment
A designed study, usually against a baseline, of what changed in incomes, health, learning or yields, and how much of that the project caused.
Question: did it make a difference?
Anaxee: no. We do not offer it.
| Implementation | Verification | Impact assessment | |
|---|---|---|---|
| When | During the project | During or just after the work | After completion, often a year later |
| What comes out | The work itself, with a record of every visit | A yes or no for each site or beneficiary, with photo and location | A study report with findings and conclusions |
| Skill it needs | Trained people on the ground, in large numbers, managed tightly | A field team that did not do the work, and a clear checklist | Evaluation design, sampling, analysis and judgement |
| Share of the effort | Most of it | A small, defined scope | A separate engagement |
| Who does it | The company, a foundation or NGO, and an on-ground execution partner | An outside field team | An evaluation or research firm |
Implementation: where the work and the money sit
Implementation is everything that has to happen in the field for a project to exist: finding the right households, explaining the programme in the local language, getting people to the camp or the counter, delivering and installing what was promised, and recording each step. It is labour, logistics and supervision, repeated across hundreds of villages.
This is what Anaxee does, and it is why the company was built. In Project Swaraksha, Anaxee recruited, trained and managed the field team and ran the whole programme itself.
Source: Project Swaraksha programme figures. Read the full story.
More on how a project is run: CSR project implementation in India.
Verification: a narrow check, not a judgement
Verification answers one plain question: is the thing that was reported really there? A field team that did not do the work visits the site and records what it finds, with a photo, a location and a time.
An example from our own work. A corporate foundation funded rooftop rainwater-harvesting systems in government schools. Our job was to visit the schools and confirm that each system had been installed. That was the whole scope. Whether the school now had more water, or whether attendance changed, was not our question and we did not answer it.
Other checks of this kind that Anaxee has run include donor-funded oxygen plants at hospitals and medical equipment delivered during COVID relief. In each case the output is the same: this exists, here, in this condition, on this date. More on this: CSR project verification.
Impact assessment: a separate discipline
Impact assessment asks whether the project changed anything, and how much of the change the project can claim. That needs an evaluation design, a baseline or a comparison group, a sampling plan, analysis, and a report that someone signs.
For large CSR projects in India it is also a legal requirement. Rule 8(3) of the Companies (CSR Policy) Rules asks companies with an average CSR obligation of ₹10 crore or more to get projects with an outlay of ₹1 crore or more assessed by an independent agency, at least a year after completion. Check the current text with the Ministry of Corporate Affairs, as the rules have been amended more than once.
Anaxee does not do impact assessment. It is not our skill and we do not sell it. If an assessor needs field data collected to their own design, our survey teams can collect it, but the study and its conclusions belong to the assessor. More on this: what an impact assessment agency does.
Why the three should stay apart
How technology helps the first two
Both implementation and verification come down to proving that a person was at a place and did a task. Every Anaxee visit is recorded on a mobile app with GPS location, time and photos. Supervisors and software checks flag visits that look wrong, such as a location that does not match or a task finished too quickly, and those are repeated. The programme owner watches progress district by district on a live dashboard and can open any single record.