CSR Projects in Water Conservation in India

CSR Projects in Water Conservation in India

Anaxee Digital Runners working with farmers in the field in rural India

CSR Atlas by Anaxee · Theme

CSR Projects in Water Conservation in India

Which companies fund water work, where, with whom, and what changed on the ground. Read from their own filings.

Quick answer: India’s large companies fund water conservation mostly through village watershed work: check dams, farm ponds, tank desilting and recharge structures near their plants, often with a technical partner such as NABARD, ICRISAT, BAIF or DHAN Foundation. This page lists the projects, places, partners and reported results from the companies’ own filings.

11 projects · 5 companiesSources: annual reports & impact assessmentsUpdated 23 Nov 2026
853water-harvesting structures built or renewed by Mahindra’s Jal Samriddhi in one yearM&M Annual Report FY2025-26
183check dams built by UltraTech near its plants, plus 75 ponds and recharge structures, up to FY2022-23UltraTech Integrated Report FY2022-23
1 crore litresexpected aquifer capacity at Rashtrapati Nilayam after Infosys-funded stepwell revivalInfosys impact assessment FY2024-25

Funding a watershed? Anaxee can map every structure and survey farmers before and after, in 540 districts.

Talk to Anaxee →
Check dam and water-harvesting basin built for land restoration at an Anaxee project site
A check dam and harvesting basin at an Anaxee land-restoration project site.

Water conservation CSR projects at a glance

CompanyProjectWhereScale or result
Mahindra & MahindraJal Samriddhi150+ villages, 8 states853 structures, 6,010 lakh litres (FY26)
Mahindra & MahindraTank restoration (DHAN)Tiruvannamalai, TNWater lasts 2–3 months longer
Mahindra & MahindraWatershed (BAIF)13 villages, Nashik, MH85% report more irrigation water
UltraTech CementCommunity watershed5 villages, Neemuch, MP65 check dams + 2 farm ponds
UltraTech CementTamas river check damMaihar, MP25,000+ villagers
UltraTech CementICRISAT watershedKurnool & Anantapur, APYields +30–40%
UltraTech CementNABARD–MYRADA watershed3 villages, Karnataka11,011 ha, 750 households
InfosysStepwell restoration (SAHE)Hyderabad, TS₹3.82 Cr; aquifer to 1 crore litres (expected)
InfosysLake rejuvenationKarnatakaApproved FY26, results pending
Reliance IndustriesBori Bandhan and pondsShahdol, MP149 structures; 1,492 farmers
Tata SteelWater storage and drinking waterJharkhand & Odisha~81 million cubic feet storage

The projects, one by one

MahindraWater8 states

Jal Samriddhi: water-harvesting structures for farming villages

Mahindra & Mahindra Ltd · 150+ villages in 8 states, including a project with NABARD at Igatpuri, Maharashtra · FY2025-26

  • 853 water-harvesting structures built or renovated in the year
  • 6,010 lakh litres of water-harvesting potential created
  • 3,793 hectares brought under better irrigation; 9,000+ hectares under water management
  • 53,862 farmers and community members reached

Source: Mahindra & Mahindra Integrated Annual Report 2025-26, Board’s report and Annexure VI

MahindraWaterTamil Nadu

Restoring village irrigation tanks in Tiruvannamalai

Mahindra & Mahindra Ltd with DHAN Vayalagam (Tank) Foundation · Tiruvannamalai district, Tamil Nadu · project year FY2023-24, assessed FY2025-26

  • Tanks desilted and deepened, bunds strengthened, sluices repaired, feeder channels cleared
  • Farmer groups (Vayalagams) formed to plan and maintain the tanks
  • All respondents said water now lasts 2 to 3 months longer after the monsoon; 75% saw better well and groundwater levels
  • Farmer groups reported a shift to double cropping, with income gains of about ₹15,000 to ₹22,000 per acre a year

Source: Mahindra Annual Report 2025-26, impact-assessment summary (BlueSky Sustainable Business LLP)

MahindraWaterMaharashtra

Recharge structures and farm ponds in 13 Nashik villages

Mahindra & Mahindra Ltd with BAIF Institute for Sustainable Livelihoods and Development · Nashik district, Maharashtra · FY2023-24, assessed FY2025-26

  • Recharge structures, farm ponds, gabions and drip-irrigation support
  • 85% of respondents said structures now hold water longer into the dry season
  • 85% reported more water for irrigation; women reported less time spent fetching water

Source: Mahindra Annual Report 2025-26, impact-assessment summary

UltraTechWaterMadhya Pradesh

65 check dams across five Neemuch villages

UltraTech Cement (Vikram Cement Works) with the Government of Madhya Pradesh · Chainpura, Pipliya Jagir, Kanpura, Dhamniya Jagir and Ghasundi Jagir, Neemuch district · since 2010

  • 67 water-harvesting structures: 65 check dams, two farm ponds and contour trenches across five villages
  • Built under the Government of India watershed scheme as a public-private partnership; UltraTech was knowledge and implementing partner and bore about 10% of the cost
  • Check dams hold water up to three months after the monsoon; farmers moved into rabi and high-value crops
  • Communities took full ownership in 2019; a January 2025 study recorded 20+ bird species returning

Source: UltraTech Cement, community watershed project story

UltraTechWaterMadhya Pradesh

A check dam on the Tamas river at Maihar

UltraTech Cement (Maihar unit) with local government and communities · Maihar, Madhya Pradesh · reported FY2023-24

  • Water storage on the Tamas river for farming and daily use through the dry season
  • Reported to benefit over 25,000 villagers

Source: UltraTech Integrated and Sustainability Report FY2023-24

UltraTechWaterAndhra Pradesh

Science-led watershed with ICRISAT in Rayalaseema

UltraTech Cement (Andhra Pradesh Cement Works) with ICRISAT · Patnikota (Kurnool) and Ayyavaripalli (Anantapur), Andhra Pradesh · from 2019

  • Rainwater harvesting, recharge and better farm practices in a drought-prone area
  • Farm yields up 30 to 40%; over 2,000 people trained
  • Won Noteworthy Project in Water Management at the CII National Awards for Excellence in Water Management 2023

Source: UltraTech Integrated and Sustainability Report FY2023-24

Source: ICRISAT project page

UltraTechWaterKarnataka

Integrated watershed with NABARD near Rajashree Cement

UltraTech Cement with NABARD, executed by MYRADA · three villages near the Rajashree Cement unit, Karnataka · reported FY2023-24

  • Covers 11,011 hectares and 750 households
  • Structures capture 60,376.68 cubic metres of water per filling
  • Agricultural yield up 15%; 29 women started income-generating work

Source: UltraTech Integrated and Sustainability Report FY2023-24

InfosysWaterTelangana

Reviving three historic stepwells at Rashtrapati Nilayam, Hyderabad

Infosys Foundation with SAHE Foundation · Hyderabad, Telangana · FY2022-23 to FY2023-24 · ₹3.82 crore

  • Jai Hind, Nakshatra and Chinna Baavi stepwells cleared and reconnected, with recharge pits and an injection borewell
  • Underground aquifer capacity expected to rise from an estimated 23.5 lakh litres to 1 crore litres
  • 1.5 to 2 lakh visitors since December 2023; ticket revenue funds upkeep of the water systems

Source: Infosys CSR impact assessment reports 2024-25 (Price Waterhouse Chartered Accountants LLP)

InfosysWaterKarnataka

Lake rejuvenation in Karnataka (approved for FY2025-26)

Infosys Foundation and Infosys Ltd · Karnataka · FY2025-26 annual action plan

  • Rejuvenation and maintenance of lakes listed as an approved project under environment sustainability
  • Outlay and results not yet published; we will add them when Infosys reports

Source: Infosys annual action plan FY2025-26

RelianceWaterMadhya Pradesh

Bori Bandhan and pond revival in Shahdol

Reliance Foundation · Shahdol district, Madhya Pradesh · FY2025-26

  • 149 low-cost Bori Bandhan structures with 8.64 lakh cubic metres of capacity, irrigating 556 acres for 1,492 farmers
  • Pond deepening and traditional structures added 6.57 lakh cubic metres for 817 acres
  • 98 villages covered by water-security work

Source: Reliance Report on CSR 2025-26

Tata SteelWaterJharkhand & Odisha

Water storage and drinking water around Tata Steel’s operations

Tata Steel Foundation · reported for FY2026

  • About 81 million cubic feet of water-storage capacity created
  • Drinking-water infrastructure strengthened for nearly 2 lakh people
  • 31,323 people counted under water-conservation work in FY2025-26

Source: Tata Steel FY2026 results presentation and Integrated Report FY2025-26

Did you know? Reliance Foundation’s 149 Bori Bandhan structures in Shahdol hold 8.64 lakh cubic metres of water, about as much as 345 Olympic swimming pools.

What Anaxee brings

Watershed results you can check on a map

35,000 haof farmland polygon-mapped for 18,700 farmers in MP
2,000+ hadrone-mapped for plot and structure checks
5.2 lakh+trees counted and geotagged in 4 MP districts
540districts where Anaxee teams can visit every structure

Explainers from Anaxee

What the filings tell us

  • Money follows the plant. UltraTech’s water work sits around its cement units (Neemuch, Maihar, Tadipatri, Malkhed). Mahindra runs Jal Samriddhi ‘across its business locations’. Expect most water CSR within a few districts of a factory.
  • A technical partner is the norm. NABARD, ICRISAT, BAIF and DHAN Foundation appear again and again. Companies fund; specialists design.
  • Outputs are counted, outcomes are surveyed. Reports count structures, litres of potential and hectares. Results such as ‘water lasts longer’ come from respondent surveys. Measured groundwater levels over several seasons are rare in these filings.
  • Madhya Pradesh shows up early. Two of the nine projects here are in MP (Neemuch and Maihar). See CSR spending in Madhya Pradesh for the state totals.

From reading about a CSR project to running one

Planning a watershed or tank-restoration programme? Anaxee can run the village work: community meetings, a geo-tagged register of every structure, before-and-after farmer surveys and a dashboard the CSR committee can open any day. If someone else is implementing, we can verify the structures and the water stored, independently.

One rule we keep: Anaxee implements some programmes and verifies others, never both on the same project.

Anaxee in numbers

40,000+Digital Runners on the Anaxee app
540districts in 26 states
11,000+pincodes reached
1 lakh+improved cookstoves handled
5.2 lakh+trees counted and geotagged
29.8 lakhcitizens counselled in Project Swaraksha

CSR, climate and social programmes delivered with

RPG FoundationITC LimitedSchaefflerReNewFirst ClimateKosher ClimateClimate Impact PartnersGiveIndiaAmerican India FoundationNTT DataGrowIndigoEVIRentomojoALCOMBiofuelCircle

Field programmes for brands

APAR IndustriesUdaanTTK PrestigeWelspunEscortsDeHaatSamunnatiAgroStarAmazon Easy

Get the CSR Atlas brief: water and climate projects

A one-page email brief with every water and climate project in the Atlas: company, place, partner, scale and result, with links to the source reports. Free.

    Related data

    Questions people ask

    Which companies fund water conservation through CSR in India?
    Among the companies in the Atlas, Mahindra & Mahindra (Jal Samriddhi, 150+ villages in 8 states in FY2025-26), UltraTech Cement (check dams and watersheds around its plants) and Infosys (stepwell and lake restoration) all report water projects. We are adding more companies each month.
    Is water conservation an allowed CSR activity?
    Yes. Schedule VII of the Companies Act, 2013 lists ensuring environmental sustainability, including conservation of natural resources and maintaining the quality of soil, air and water. Companies report such projects under environment sustainability or rural development.
    How can an NGO get CSR funding for a water project?
    Start with companies that have a plant or office in your district, because most water CSR stays close to operations. Read their CSR annual action plan, show a technical partner or method, and offer clear before-and-after measures. The company pages in this Atlas list each firm’s focus areas and partners.
    How are the results of these projects measured?
    Mostly through structure counts, storage potential and beneficiary surveys in the impact-assessment reports. A few projects cite yield changes. Independent field measurement of groundwater over several seasons is uncommon in the published reports.

    Figures are as published in each company’s CSR reports, linked beside every project. CSR Atlas is independent and not affiliated with the companies listed. Spotted an error? Email sales@anaxee.com.